Centre of Greenwich

The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the same size. The new unit was 200 tons larger then the previous unit and had fans installed. In order to reduce noise from the fans we mounted vibration insulators. The steel was replaced with new galvanized steel and braced with webbing.