Level 1 Energy Audit

September 9, 2014

We perform energy audits for most of our customers. It gives us information about energy usage,  savings, and the potential for rebates and incentives. Our audits begin with a Level 1 Energy Audit/Pre-Audit. The…

Read More
Leeway House, RTU Installation

Leeway House

April 13, 2014

Leeway house had several defective rooftop units and had elevated energy costs. We installed 13 new high efficiency American Standard Rooftop heating and cooling units with economizers and dual enthalpy controllers. We also…

Read More

American Steakhouse

April 13, 2014

American Steakhouse in Norwalk had a RTU heater malfunction. They had a dining room full of customers that was getting colder by the minute. They called Controlled Air for help. Our technicians found the…

Read More
Backus Hospital Generator

Backus Hospital

April 6, 2014

Backus Hospital’s equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was…

Read More

West Haven Medical Center

March 16, 2014

During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We…

Read More

Pharmaceutical Laboratory

March 10, 2014

We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has…

Read More
Soundview YMCA New Construction

Soundview YMCA

March 6, 2014

The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat…

Read More
Holly Hill Office Building RTU Replacement

Holly Hill Office Space

March 5, 2014

Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower…

Read More
Centre of Greenwich Piping

Centre of Greenwich

March 5, 2014

The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that…

Read More

Union Plaza Roof Top Replacement

March 3, 2014

Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The…

Read More
Fairfield Police Station Congeneration System

Fairfield Police Station Trigeneration

March 3, 2014

We installed a new TecoGen CM-50 50 kW gas fired Cogeneration unit. We also furnished and installed gas lines, make-up water lines, radiator piping, hot water piping, heat exchanger, circulators, and electrical conduit…

Read More

Five Guys Burger Roof Top Unit

February 21, 2014

When we were called in to review Five Guys Burger’s RTU they were in bad condition. The equipment was dirty, old parts were just scattered around and there was a belt just lying on…

Read More