<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>hospital Archives | Controlled Air, Inc.</title>
	<atom:link href="https://www.controlledair.com/tag/hospital/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.controlledair.com/tag/hospital/</link>
	<description>HVAC, Building Controls &#38; Energy Systems for commercial facilities throughout New England</description>
	<lastBuildDate>Fri, 20 Mar 2026 12:21:35 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.controlledair.com/wp-content/uploads/2026/03/cropped-ca-favicon-32x32.jpg</url>
	<title>hospital Archives | Controlled Air, Inc.</title>
	<link>https://www.controlledair.com/tag/hospital/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>HVAC and VRF, Rocky Hill CT &#124; Surgery and Medical Center</title>
		<link>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=rocky-hill-surgery-center</link>
					<comments>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 09 Aug 2018 14:57:03 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[Surgical Centers]]></category>
		<category><![CDATA[VRF]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[hospital]]></category>
		<category><![CDATA[HVAC]]></category>
		<category><![CDATA[pharmaceutical]]></category>
		<category><![CDATA[surgery center]]></category>
		<category><![CDATA[vrf]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/rocky-hill-surgery-center/</guid>

					<description><![CDATA[<p>Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/">HVAC and VRF, Rocky Hill CT | Surgery and Medical Center</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Controlled Air, Inc. was excited to work with <a href="https://www.a-zcorp.com/" target="_blank" rel="noopener" data-cke-saved-href="https://www.a-zcorp.com/">AZ Corporation</a> on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and HEPA filtration. The project has three phases: Phase 1, The Core; Phase 2, Surgery; and Phase 3, Medical Office Building.</p>



<p><strong>Just to give you an idea of the enormity of this project, it required over 58,000 ft. of ductwork with a combination of insulted and non-insulated. A brief overview of just some of the HVAC equipment we installed includes:</strong></p>



<ul class="wp-block-list">
<li>Seven AAON units with humidity control, return air bypass, energy efficient dehumidification and economizers; one AAON units with a premium efficiency motor, economizer with power exhaust and a VFD; one AAON unit with an Energy Recovery wheel, premium efficiency motor, and 2 motors on 2 VFDs; and two 25 Ton High Efficiency Lennox RTUs with variable volume air flow and economizers. All new RTU&#8217;s installed use R-410A refrigerant per the EPA requirements.</li>



<li>We also installed six (6) Sterling Linear Radiant Hydronic Ceiling Panels. Radiant Panel ceiling systems are an energy and cost saving method of heating. They provide distributed heating radiantly rather than by forced air providing a &#8220;draftless&#8221; environment.</li>



<li>2 PK Gas fired condensing boilers with Axiom Condensate Neutralization Tank and Nuro touch-screen control system.</li>



<li>8 Nortec Humidifiers, The industry&#8217;s most precise humidifier. An isothermal system that produces mineral free, odorless, sterile steam from any water type.</li>



<li>Ceiling Grid System by Titus which allows for the building of critical environment spaces with flexibility. Each system is custom engineered to meet the requirements of codes and guidelines, such as ASHRAE Standard 170 and the Facility Guidelines Institute (FGI) &#8216;Guidelines for Design and construction of Hospitals and Outpatient Facilities.&#8217;</li>
</ul>



<p>The Expected completion date is 10/31/2018.</p>



<p>What is always challenging about medical facilities and pharmacies, are the extensive regulations for air changes, filtration, as well as humidity and temperature controls. Unlike office buildings where the building requires consistent settings throughout the building, medical facilities can have different requirements per area. Surgical rooms and pharmacies, have different settings from the offices and also from each other. It take extensive controls and programming to make sure each area functions as required.</p>



<div id="block-2393_974815-0c" class="wp-block-firebox-buttons block-840_b63706-dc wp-block-firebox buttons-direction-row"><style>.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; justify-content: flex-start; flex-direction: row; }


			@media (max-width: 991px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}
			

			@media (max-width: 575px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}</style>
<div id="block-2393_d25523-df" class="wp-block-firebox-button block-840_c6e6d5-28"><style>.wp-block-firebox-button.block-840_c6e6d5-28 { font-weight: 400; font-style: normal; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element { border-radius: 0px; color: #fff; background-color: #dc1f38; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element svg { fill: #fff; }</style><a href="https://www.controlledair.com/systems/" class="firebox-block-button-element">Learn More about our Commercial HVAC Solutions<svg class="firebox-button-icon" xmlns="http://www.w3.org/2000/svg" viewBox="0 0 448 512"><path d="M246.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L178.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C47.63 444.9 55.81 448 64 448s16.38-3.125 22.62-9.375l160-160C259.1 266.1 259.1 245.9 246.6 233.4zM438.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L370.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C239.6 444.9 247.8 448 256 448s16.38-3.125 22.62-9.375l160-160C451.1 266.1 451.1 245.9 438.6 233.4z"/></svg></a></div>
</div>



<p></p>
<p>The post <a href="https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/">HVAC and VRF, Rocky Hill CT | Surgery and Medical Center</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>HVAC Installation, Hartford CT &#124; Hartford Hospital Histology</title>
		<link>https://www.controlledair.com/client-showcase/hartford-hospital-histology/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=hartford-hospital-histology</link>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 24 May 2018 13:38:49 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[HVAC]]></category>
		<category><![CDATA[Medical Laboratories]]></category>
		<category><![CDATA[controls]]></category>
		<category><![CDATA[hospital]]></category>
		<category><![CDATA[laboratory]]></category>
		<category><![CDATA[medical]]></category>
		<category><![CDATA[pharmaceutical]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/hartford-hospital-histology/</guid>

					<description><![CDATA[<p>For this project we needed to set up a new lab in an existing hospital space. There was a lot of intricacy, coordination and planning to work inside a functioning hospital that allowed for no downtime. The exhaust fan was 3 floors down and autopsy and tissue sampling was using the same system. Additionally the&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/hartford-hospital-histology/">HVAC Installation, Hartford CT | Hartford Hospital Histology</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fl-builder-content fl-builder-content-715 fl-builder-content-primary fl-builder-global-templates-locked" data-post-id="715"><div class="fl-row fl-row-fixed-width fl-row-bg-none fl-node-67kmnhtjuisc fl-row-default-height fl-row-align-center" data-node="67kmnhtjuisc">
	<div class="fl-row-content-wrap">
						<div class="fl-row-content fl-row-fixed-width fl-node-content">
		
<div class="fl-col-group fl-node-qn0y63cjur9i" data-node="qn0y63cjur9i">
			<div class="fl-col fl-node-ay92nfoius16 fl-col-bg-color" data-node="ay92nfoius16">
	<div class="fl-col-content fl-node-content"><div class="fl-module fl-module-rich-text fl-node-g4t6lrs89f15" data-node="g4t6lrs89f15">
	<div class="fl-module-content fl-node-content">
		<div class="fl-rich-text">
	<p>For this project we needed to set up a new lab in an existing hospital space. There was a lot of intricacy, coordination and planning to work inside a functioning hospital that allowed for no downtime. The exhaust fan was 3 floors down and autopsy and tissue sampling was using the same system. Additionally the air handler had to be changed on the fly as it fed the maternity ward and other areas that could not be shut down.</p>
<p>We furnished and installed one roof mounted exhaust fan connecting to existing system, along with a new steam coil, hot water coils,  piping modifications, and custom grilles for the downdraft system cabinets. Additionally we installed three Accu Valve VAV boxes, two with fume hood controllers, registers, grilles &amp; diffusers and piping as required. New stainless ductwork with exterior supply duct having board insulation with peel-n-seal covering. We also installed a specialty exhaust system on the lab tables that pulls the air through the back splash to reduce or eliminate issues of contamination or smells.</p>
</div>
	</div>
</div>
</div>
</div>
	</div>
		</div>
	</div>
</div>
</div><p>The post <a href="https://www.controlledair.com/client-showcase/hartford-hospital-histology/">HVAC Installation, Hartford CT | Hartford Hospital Histology</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
