<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Hospitals Archives | Controlled Air, Inc.</title>
	<atom:link href="https://www.controlledair.com/category/client-showcase/hospitals/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.controlledair.com/category/client-showcase/hospitals/</link>
	<description>HVAC, Building Controls &#38; Energy Systems for commercial facilities throughout New England</description>
	<lastBuildDate>Fri, 20 Mar 2026 12:24:11 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.controlledair.com/wp-content/uploads/2026/03/cropped-ca-favicon-32x32.jpg</url>
	<title>Hospitals Archives | Controlled Air, Inc.</title>
	<link>https://www.controlledair.com/category/client-showcase/hospitals/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>VRF, Rooftop Units and Controls, Plantsville CT &#124; LiveWell Care Facility</title>
		<link>https://www.controlledair.com/client-showcase/livewell/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=livewell</link>
					<comments>https://www.controlledair.com/client-showcase/livewell/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Wed, 11 Oct 2023 15:10:02 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[VRF]]></category>
		<category><![CDATA[aaon]]></category>
		<category><![CDATA[medical]]></category>
		<category><![CDATA[medical center]]></category>
		<category><![CDATA[vrf]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/livewell/</guid>

					<description><![CDATA[<p>Controlled Air is part of a 50 million expansion at Dementia-focused LiveWell in the Plantsville section of Southington. LiveWell is a not-for-profit care provider that is solely focused on providing services for people with Alzheimer&#8217;s disease and dementia. Its 8-acre campus features nursing, assisted living, and adult day facilities. The new facility will add more&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/livewell/">VRF, Rooftop Units and Controls, Plantsville CT | LiveWell Care Facility</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fl-builder-content fl-builder-content-1013 fl-builder-content-primary fl-builder-global-templates-locked" data-post-id="1013"><div class="fl-row fl-row-fixed-width fl-row-bg-none fl-node-udf9iwp3lzex fl-row-default-height fl-row-align-center" data-node="udf9iwp3lzex">
	<div class="fl-row-content-wrap">
						<div class="fl-row-content fl-row-fixed-width fl-node-content">
		
<div class="fl-col-group fl-node-jsyx94lpcobr" data-node="jsyx94lpcobr">
			<div class="fl-col fl-node-5dxkubj493hg fl-col-bg-color" data-node="5dxkubj493hg">
	<div class="fl-col-content fl-node-content"><div class="fl-module fl-module-rich-text fl-node-pfez8juibo2a" data-node="pfez8juibo2a">
	<div class="fl-module-content fl-node-content">
		<div class="fl-rich-text">
	<p>Controlled Air is part of a 50 million expansion at Dementia-focused <a href="https://livewell.org/riverhomes/?gclid=Cj0KCQjwj5mpBhDJARIsAOVjBdordH9j2W0TtVG6xJ8LICSa4snEnhMiXnyyh1YoM6dvgL-da-euYK8aApqgEALw_wcB" target="_blank" rel="noopener">LiveWell</a> in the Plantsville section of Southington. LiveWell is a not-for-profit care provider that is solely focused on providing services for people with Alzheimer&#8217;s disease and dementia. Its 8-acre campus features nursing, assisted living, and adult day facilities.</p>
<p>The new facility will add more assisted living beds and community services, to help support those with dementia who aim to stay at home longer. The project also will increase campus capacity from 133 to 141 residents.<br />Construction at the LiveWell campus started in 2022. The work is being done in phases, with three new facility buildings and modifications to the existing facility. The entire project is on track to be finished by mid-2024.</p>
<p>Controlled Air has installed multiple systems in three new facility buildings, including gas/electric Aaon rooftop units and make-up air units; two Lennox VRF systems with heat recovery in each of the new River Homes buildings with 15 to 16 ducted indoor units and multiple high wall units for each system; and 2 to 4 outdoor units ranging from 8 to 10 tons. Each new facility is equipped with a <a href="https://www.controlledair.com/building-automation-controls/" target="_blank" rel="noopener">Johnson Controls FX building</a> management system. The project has been work intensive with tight deadlines. Controlled Air assigned our senior project manager and foreman to make sure the deadlines are met with the quality that Controlled Air is known.</p>
<p>Lennox VRF® systems are a flexible solution that is ideal for a wide range of applications and commercial buildings. Lennox VRF makes customized comfort easy and efficient. <a href="https://www.lennoxcommercial.com/products/variable-refrigerant-flow/vrb-heat-recovery" target="_blank" rel="noopener">Lennox VRF® Heat Recovery units</a> offer simultaneous heating and cooling. The heat recovery process moves heat from spaces requiring cooling into spaces requiring heating, maximizing energy efficiency and occupant comfort.</p>
<p>Keep your eye out, more information will be coming soon.</p>
</div>
	</div>
</div>
<div class="fl-module fl-module-gallery fl-node-5io6wl40xzeg" data-node="5io6wl40xzeg">
	<div class="fl-module-content fl-node-content">
		<div class="fl-mosaicflow">
	<div role="list" class="fl-mosaicflow-content">
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-13.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1032" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-13.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-13.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-13-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-15.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1033" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-15.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-15.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-15-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-10.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1030" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-10.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-10.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-10-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-12.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1031" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-12.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-12.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-12-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-19.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1028" src="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-19.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-19.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livwell-19-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-vrf-18.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1029" src="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-vrf-18.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livwell-vrf-18.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livwell-vrf-18-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-17.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1026" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-17.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-17.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-17-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-20.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1027" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-20.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-20.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-20-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-16.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1025" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-16.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-16.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-16-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-24-576x1024.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="576" height="1024" class="fl-photo-img wp-image-1023" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-24-576x1024.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-24-576x1024.jpg 576w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-24-169x300.jpg 169w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-24.jpg 750w" sizes="auto, (max-width: 576px) 100vw, 576px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-21.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1024" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-21.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-21.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-21-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-22-576x1024.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="576" height="1024" class="fl-photo-img wp-image-1022" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-22-576x1024.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-22-576x1024.jpg 576w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-22-169x300.jpg 169w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-22.jpg 750w" sizes="auto, (max-width: 576px) 100vw, 576px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-5.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1020" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-5.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-5.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-5-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-6.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1021" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-6.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-6.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-6-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-4.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1019" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-4.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-4.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-4-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1017" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-2.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1018" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-2.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-2.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-2-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-11.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="480" height="640" class="fl-photo-img wp-image-1015" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-11.jpg" alt="Livewell Installation" title="Livewell Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-11.jpg 480w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-11-225x300.jpg 225w" sizes="auto, (max-width: 480px) 100vw, 480px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-piping.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1016" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-piping.jpg" alt="Livewell VRF Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-piping.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-piping-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-14.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="640" height="480" class="fl-photo-img wp-image-1014" src="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-14.jpg" alt="Livewell Installation" title="Livewell VRF Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-14.jpg 640w, https://www.controlledair.com/wp-content/uploads/2024/11/livewell-vrf-14-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />
				</a>
					</div>
	</div>
		</div>
			</div role=&quot;list&quot;>
	<div class="fl-clear"></div>
</div>
	</div>
</div>
</div>
</div>
	</div>
		</div>
	</div>
</div>
</div><p>The post <a href="https://www.controlledair.com/client-showcase/livewell/">VRF, Rooftop Units and Controls, Plantsville CT | LiveWell Care Facility</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/livewell/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>HVAC Installation,  Sharon CT &#124; Sharon Hospital</title>
		<link>https://www.controlledair.com/client-showcase/sharon-hospital-hvac-upgrades/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sharon-hospital-hvac-upgrades</link>
					<comments>https://www.controlledair.com/client-showcase/sharon-hospital-hvac-upgrades/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Wed, 10 Jul 2019 14:57:19 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/sharon-hospital-hvac-upgrades/</guid>

					<description><![CDATA[<p>Sharon Hospital HVAC Upgrades Throughout the hospital Controlled Air, Inc. provided the following work: Fire Dampers, Air registers and diffusers, Hot water VAVs and associated piping, Ductwork, as well as Johnson controls BMS and wiring. The behavioral health unit in Sharon Hospital provides short-term psychiatric care of patients 55 and older. The unit provides acute&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/sharon-hospital-hvac-upgrades/">HVAC Installation,  Sharon CT | Sharon Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h3 class="wp-block-heading">Sharon Hospital HVAC Upgrades</h3>



<p>Throughout the hospital Controlled Air, Inc. provided the following work: Fire Dampers, Air registers and diffusers, Hot water VAVs and associated piping, Ductwork, as well as Johnson controls BMS and wiring.</p>



<p>The behavioral health unit in Sharon Hospital provides short-term psychiatric care of patients 55 and older. The unit provides acute care for short-term stays; admission may be a result of factors relating to the aging process. Others have been living much of their lives with psychiatric conditions, which can be exacerbated with age. Controlled Air, Inc. had to follow both typical hospital requirements, as well as for those of a psychiatric facility in order to follow code for this renovation.</p>



<p>Controlled Air, Inc. installed a Carrier roof top air handler , VAV boxes with hot water reheat coils, a steam to hot water heat exchanger off the steam boiler plant, hot water pumps, exhaust fans, hot water piping and insulation, ductwork and a controls system. Because of the psychiatric component all finishes within this unit had to be ligature resistant to protect the patents from self-harm. Our ligature resistant finishes included supply and return air diffusers, thermostats, radiator covers, exposed hardware was tamper proof and calking was specialty pick proof.</p>



<p>This project was also multi-phased and required performing the scope of work without interruption to the hospital. Proper coordination was critical to keep existing systems up and running to maintain air conditions to existing occupied spaces. Temporary cooling units supplied by Controlled Air, Inc. were used to maintain conditions in these spaces as required.</p>



<p>Low ceiling height was another challenge to work with. This wing of the hospital was circa 1960s and wasn&#8217;t designed for today high efficiency mechanicals with larger insulation and added controls systems, both HVAC and additional hospital controls. Ductwork was especially difficult to route through the existing structure and required careful coordination with all trades.</p>



<div id="block-2393_974815-0c" class="wp-block-firebox-buttons block-840_b63706-dc wp-block-firebox buttons-direction-row"><style>.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; justify-content: flex-start; flex-direction: row; }


			@media (max-width: 991px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}
			

			@media (max-width: 575px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}</style>
<div id="block-2393_d25523-df" class="wp-block-firebox-button block-840_c6e6d5-28"><style>.wp-block-firebox-button.block-840_c6e6d5-28 { font-weight: 400; font-style: normal; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element { border-radius: 0px; color: #fff; background-color: #dc1f38; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element svg { fill: #fff; }</style><a href="https://www.controlledair.com/systems/" class="firebox-block-button-element">Learn More about our Commercial HVAC Solutions<svg class="firebox-button-icon" xmlns="http://www.w3.org/2000/svg" viewBox="0 0 448 512"><path d="M246.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L178.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C47.63 444.9 55.81 448 64 448s16.38-3.125 22.62-9.375l160-160C259.1 266.1 259.1 245.9 246.6 233.4zM438.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L370.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C239.6 444.9 247.8 448 256 448s16.38-3.125 22.62-9.375l160-160C451.1 266.1 451.1 245.9 438.6 233.4z"/></svg></a></div>
</div>
<p>The post <a href="https://www.controlledair.com/client-showcase/sharon-hospital-hvac-upgrades/">HVAC Installation,  Sharon CT | Sharon Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/sharon-hospital-hvac-upgrades/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>HVAC and VRF, Rocky Hill CT &#124; Surgery and Medical Center</title>
		<link>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=rocky-hill-surgery-center</link>
					<comments>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 09 Aug 2018 14:57:03 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[Surgical Centers]]></category>
		<category><![CDATA[VRF]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[hospital]]></category>
		<category><![CDATA[HVAC]]></category>
		<category><![CDATA[pharmaceutical]]></category>
		<category><![CDATA[surgery center]]></category>
		<category><![CDATA[vrf]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/rocky-hill-surgery-center/</guid>

					<description><![CDATA[<p>Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/">HVAC and VRF, Rocky Hill CT | Surgery and Medical Center</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Controlled Air, Inc. was excited to work with <a href="https://www.a-zcorp.com/" target="_blank" rel="noopener" data-cke-saved-href="https://www.a-zcorp.com/">AZ Corporation</a> on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and HEPA filtration. The project has three phases: Phase 1, The Core; Phase 2, Surgery; and Phase 3, Medical Office Building.</p>



<p><strong>Just to give you an idea of the enormity of this project, it required over 58,000 ft. of ductwork with a combination of insulted and non-insulated. A brief overview of just some of the HVAC equipment we installed includes:</strong></p>



<ul class="wp-block-list">
<li>Seven AAON units with humidity control, return air bypass, energy efficient dehumidification and economizers; one AAON units with a premium efficiency motor, economizer with power exhaust and a VFD; one AAON unit with an Energy Recovery wheel, premium efficiency motor, and 2 motors on 2 VFDs; and two 25 Ton High Efficiency Lennox RTUs with variable volume air flow and economizers. All new RTU&#8217;s installed use R-410A refrigerant per the EPA requirements.</li>



<li>We also installed six (6) Sterling Linear Radiant Hydronic Ceiling Panels. Radiant Panel ceiling systems are an energy and cost saving method of heating. They provide distributed heating radiantly rather than by forced air providing a &#8220;draftless&#8221; environment.</li>



<li>2 PK Gas fired condensing boilers with Axiom Condensate Neutralization Tank and Nuro touch-screen control system.</li>



<li>8 Nortec Humidifiers, The industry&#8217;s most precise humidifier. An isothermal system that produces mineral free, odorless, sterile steam from any water type.</li>



<li>Ceiling Grid System by Titus which allows for the building of critical environment spaces with flexibility. Each system is custom engineered to meet the requirements of codes and guidelines, such as ASHRAE Standard 170 and the Facility Guidelines Institute (FGI) &#8216;Guidelines for Design and construction of Hospitals and Outpatient Facilities.&#8217;</li>
</ul>



<p>The Expected completion date is 10/31/2018.</p>



<p>What is always challenging about medical facilities and pharmacies, are the extensive regulations for air changes, filtration, as well as humidity and temperature controls. Unlike office buildings where the building requires consistent settings throughout the building, medical facilities can have different requirements per area. Surgical rooms and pharmacies, have different settings from the offices and also from each other. It take extensive controls and programming to make sure each area functions as required.</p>



<div id="block-2393_974815-0c" class="wp-block-firebox-buttons block-840_b63706-dc wp-block-firebox buttons-direction-row"><style>.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; justify-content: flex-start; flex-direction: row; }


			@media (max-width: 991px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}
			

			@media (max-width: 575px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}</style>
<div id="block-2393_d25523-df" class="wp-block-firebox-button block-840_c6e6d5-28"><style>.wp-block-firebox-button.block-840_c6e6d5-28 { font-weight: 400; font-style: normal; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element { border-radius: 0px; color: #fff; background-color: #dc1f38; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element svg { fill: #fff; }</style><a href="https://www.controlledair.com/systems/" class="firebox-block-button-element">Learn More about our Commercial HVAC Solutions<svg class="firebox-button-icon" xmlns="http://www.w3.org/2000/svg" viewBox="0 0 448 512"><path d="M246.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L178.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C47.63 444.9 55.81 448 64 448s16.38-3.125 22.62-9.375l160-160C259.1 266.1 259.1 245.9 246.6 233.4zM438.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L370.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C239.6 444.9 247.8 448 256 448s16.38-3.125 22.62-9.375l160-160C451.1 266.1 451.1 245.9 438.6 233.4z"/></svg></a></div>
</div>



<p></p>
<p>The post <a href="https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/">HVAC and VRF, Rocky Hill CT | Surgery and Medical Center</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/rocky-hill-surgery-center/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>AAON Rooftop Units, Plainfield CT &#124; Backus Hospital</title>
		<link>https://www.controlledair.com/client-showcase/backus-hospital-plainfield/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=backus-hospital-plainfield</link>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 03 May 2018 18:56:08 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/backus-hospital-plainfield/</guid>

					<description><![CDATA[<p>Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with specific humidification requirements. Additionally we&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital-plainfield/">AAON Rooftop Units, Plainfield CT | Backus Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p>Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with specific humidification requirements. Additionally we installed AAON roof top units and two high efficiency PK boilers.</p>



<div id="block-2393_974815-0c" class="wp-block-firebox-buttons block-840_b63706-dc wp-block-firebox buttons-direction-row"><style>.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; justify-content: flex-start; flex-direction: row; }


			@media (max-width: 991px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}
			

			@media (max-width: 575px) {
				.wp-block-firebox-buttons.block-840_b63706-dc { gap: 8px; }
			}</style>
<div id="block-2393_d25523-df" class="wp-block-firebox-button block-840_c6e6d5-28"><style>.wp-block-firebox-button.block-840_c6e6d5-28 { font-weight: 400; font-style: normal; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element { border-radius: 0px; color: #fff; background-color: #dc1f38; }
.wp-block-firebox-button.block-840_c6e6d5-28 .firebox-block-button-element svg { fill: #fff; }</style><a href="https://www.controlledair.com/systems/" class="firebox-block-button-element">Learn More about our Commercial HVAC Solutions<svg class="firebox-button-icon" xmlns="http://www.w3.org/2000/svg" viewBox="0 0 448 512"><path d="M246.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L178.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C47.63 444.9 55.81 448 64 448s16.38-3.125 22.62-9.375l160-160C259.1 266.1 259.1 245.9 246.6 233.4zM438.6 233.4l-160-160c-12.5-12.5-32.75-12.5-45.25 0s-12.5 32.75 0 45.25L370.8 256l-137.4 137.4c-12.5 12.5-12.5 32.75 0 45.25C239.6 444.9 247.8 448 256 448s16.38-3.125 22.62-9.375l160-160C451.1 266.1 451.1 245.9 438.6 233.4z"/></svg></a></div>
</div>
<p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital-plainfield/">AAON Rooftop Units, Plainfield CT | Backus Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>AAON Rooftop Unit, Sharon CT &#124; Sharon Hospital</title>
		<link>https://www.controlledair.com/client-showcase/sharon-hospital/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sharon-hospital</link>
					<comments>https://www.controlledair.com/client-showcase/sharon-hospital/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 14 Dec 2017 18:22:12 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<category><![CDATA[Pharmacies]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/sharon-hospital/</guid>

					<description><![CDATA[<p>Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, &#8220;a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation,&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/sharon-hospital/">AAON Rooftop Unit, Sharon CT | Sharon Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fl-builder-content fl-builder-content-625 fl-builder-content-primary fl-builder-global-templates-locked" data-post-id="625"><div class="fl-row fl-row-fixed-width fl-row-bg-none fl-node-v8lgkr1efqpb fl-row-default-height fl-row-align-center" data-node="v8lgkr1efqpb">
	<div class="fl-row-content-wrap">
						<div class="fl-row-content fl-row-fixed-width fl-node-content">
		
<div class="fl-col-group fl-node-zkx8iv0dutb2" data-node="zkx8iv0dutb2">
			<div class="fl-col fl-node-lhimowerjsq3 fl-col-bg-color" data-node="lhimowerjsq3">
	<div class="fl-col-content fl-node-content"><div class="fl-module fl-module-rich-text fl-node-jpk1hx6uet5s" data-node="jpk1hx6uet5s">
	<div class="fl-module-content fl-node-content">
		<div class="fl-rich-text">
	<p>Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, &#8220;a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation, and retention of particles inside the room, an din which other relevant parameters, e.g. temperature, humidity, and pressure, are controlled as necessary.&#8221;</p>
<p>We removed the existing RTU system and installed new AAON RTU with registers, grills and diffusers, and a controls system. We also installed a roof mounted exhaust fan and additional ductwork.</p>
<p>The project included upgrades to existing Johnson Controls System. The controls have specific requirements for air flow and exhaust as well as room pressure levels.</p>
</div>
	</div>
</div>
</div>
</div>
	</div>
		</div>
	</div>
</div>
</div><p>The post <a href="https://www.controlledair.com/client-showcase/sharon-hospital/">AAON Rooftop Unit, Sharon CT | Sharon Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/sharon-hospital/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Gas Conversation, Wallingford CT &#124; Gaylord Hospital</title>
		<link>https://www.controlledair.com/client-showcase/gaylord-hospital-gas-conversion/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=gaylord-hospital-gas-conversion</link>
					<comments>https://www.controlledair.com/client-showcase/gaylord-hospital-gas-conversion/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 13 Nov 2014 15:28:53 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/gaylord-hospital-gas-conversion/</guid>

					<description><![CDATA[<p>Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion was completed quickly so that&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/gaylord-hospital-gas-conversion/">Gas Conversation, Wallingford CT | Gaylord Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fl-builder-content fl-builder-content-537 fl-builder-content-primary fl-builder-global-templates-locked" data-post-id="537"><div class="fl-row fl-row-fixed-width fl-row-bg-none fl-node-8t9e50wu4p7y fl-row-default-height fl-row-align-center" data-node="8t9e50wu4p7y">
	<div class="fl-row-content-wrap">
						<div class="fl-row-content fl-row-fixed-width fl-node-content">
		
<div class="fl-col-group fl-node-s71kdoti9whl" data-node="s71kdoti9whl">
			<div class="fl-col fl-node-b5840uvzc1as fl-col-bg-color" data-node="b5840uvzc1as">
	<div class="fl-col-content fl-node-content"><div class="fl-module fl-module-rich-text fl-node-5wejboz4uad3" data-node="5wejboz4uad3">
	<div class="fl-module-content fl-node-content">
		<div class="fl-rich-text">
	<p>Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment.</p>
<p>We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion was completed quickly so that they were prepared for winter.</p>
</div>
	</div>
</div>
<div class="fl-module fl-module-gallery fl-node-sv46ado7xeqi" data-node="sv46ado7xeqi">
	<div class="fl-module-content fl-node-content">
		<div class="fl-mosaicflow">
	<div role="list" class="fl-mosaicflow-content">
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715-1024x765.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="1024" height="765" class="fl-photo-img wp-image-538" src="https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715-1024x765.jpg" alt="Gaylord Hospital Natural Gas Conversion" title="Gaylord Hospital Natural Gas Conversion" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715-1024x765.jpg 1024w, https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715-768x574.jpg 768w, https://www.controlledair.com/wp-content/uploads/2024/11/IMG_1715.jpg 1100w" sizes="auto, (max-width: 1024px) 100vw, 1024px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-1024x765.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="1024" height="765" class="fl-photo-img wp-image-1648" src="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-1024x765.jpg" alt="Gaylord hospital gas conversion piping" title="Gaylord hospital gas conversion piping" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-1024x765.jpg 1024w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-768x574.jpg 768w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-1536x1147.jpg 1536w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1597-2048x1530.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-1024x765.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="1024" height="765" class="fl-photo-img wp-image-1649" src="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-1024x765.jpg" alt="Gaylord hospital gas conversion piping" title="Gaylord" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-1024x765.jpg 1024w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-768x574.jpg 768w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-1536x1147.jpg 1536w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1671-2048x1530.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-1024x765.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="1024" height="765" class="fl-photo-img wp-image-1650" src="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-1024x765.jpg" alt="Gaylord hospital gas conversion piping" title="Gaylord" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-1024x765.jpg 1024w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-768x574.jpg 768w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-1536x1147.jpg 1536w, https://www.controlledair.com/wp-content/uploads/2014/11/IMG_1674-2048x1530.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" />
				</a>
					</div>
	</div>
		</div>
			</div role=&quot;list&quot;>
	<div class="fl-clear"></div>
</div>
	</div>
</div>
</div>
</div>
	</div>
		</div>
	</div>
</div>
</div><p>The post <a href="https://www.controlledair.com/client-showcase/gaylord-hospital-gas-conversion/">Gas Conversation, Wallingford CT | Gaylord Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/gaylord-hospital-gas-conversion/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>High Efficiency Boilers, Norwich CT &#124; Backus Hospital</title>
		<link>https://www.controlledair.com/client-showcase/backus-hospital/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=backus-hospital</link>
					<comments>https://www.controlledair.com/client-showcase/backus-hospital/#respond</comments>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Sun, 06 Apr 2014 15:55:47 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/backus-hospital/</guid>

					<description><![CDATA[<p>Backus Hospital’s equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger and oil burner were also&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital/">High Efficiency Boilers, Norwich CT | Backus Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fl-builder-content fl-builder-content-549 fl-builder-content-primary fl-builder-global-templates-locked" data-post-id="549"><div class="fl-row fl-row-fixed-width fl-row-bg-none fl-node-ym5i0r3a8kh4 fl-row-default-height fl-row-align-center" data-node="ym5i0r3a8kh4">
	<div class="fl-row-content-wrap">
						<div class="fl-row-content fl-row-fixed-width fl-node-content">
		
<div class="fl-col-group fl-node-q98kltf7wpxn" data-node="q98kltf7wpxn">
			<div class="fl-col fl-node-19qk8sze7rbl fl-col-bg-color" data-node="19qk8sze7rbl">
	<div class="fl-col-content fl-node-content"><div class="fl-module fl-module-rich-text fl-node-8n0kygsilhm6" data-node="8n0kygsilhm6">
	<div class="fl-module-content fl-node-content">
		<div class="fl-rich-text">
	<p>Backus Hospital’s equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger and oil burner were also cracked. We removed the oil tank and installed a modular building to house two new Patterson-Kelly gas fired condensing boilers. We added hot water heating coils to replace the heat exchanger and two Armstrong pumps. We also installed a 1000 gal steel tank of diesel for the generator with monitoring controls that tied into the existing tank control panel.</p>
</div>
	</div>
</div>
<div class="fl-module fl-module-gallery fl-node-79qklg4zdxrn" data-node="79qklg4zdxrn">
	<div class="fl-module-content fl-node-content">
		<div class="fl-mosaicflow">
	<div role="list" class="fl-mosaicflow-content">
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0228_fullsize.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="800" height="598" class="fl-photo-img wp-image-1671" src="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0228_fullsize.jpg" alt="Backus Hospital Installation" title="Backus Hospital Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0228_fullsize.jpg 800w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0228_fullsize-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0228_fullsize-768x574.jpg 768w" sizes="auto, (max-width: 800px) 100vw, 800px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize-765x1024.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="765" height="1024" class="fl-photo-img wp-image-1672" src="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize-765x1024.jpg" alt="Backus Hospital Installation" title="Backus_0765_fullsize" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize-765x1024.jpg 765w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize-224x300.jpg 224w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize-768x1028.jpg 768w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_0765_fullsize.jpg 800w" sizes="auto, (max-width: 765px) 100vw, 765px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1322_fullsize.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="800" height="598" class="fl-photo-img wp-image-1673" src="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1322_fullsize.jpg" alt="Backus Hospital Chiller Installation | Connecticut" title="Backus_1322_fullsize" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1322_fullsize.jpg 800w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1322_fullsize-300x224.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1322_fullsize-768x574.jpg 768w" sizes="auto, (max-width: 800px) 100vw, 800px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1328_fullsize.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="800" height="665" class="fl-photo-img wp-image-1674" src="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1328_fullsize.jpg" alt="Backus Hospital High Efficiency Mach Boiler Installation" title="Backus Hospital Boiler Installation" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1328_fullsize.jpg 800w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1328_fullsize-300x249.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1328_fullsize-768x638.jpg 768w" sizes="auto, (max-width: 800px) 100vw, 800px" />
				</a>
					</div>
	</div>
		</div>
				<div class="fl-mosaicflow-item">
			<div role="figure" class="fl-photo fl-photo-align-center" itemscope itemtype="https://schema.org/ImageObject">
	<div class="fl-photo-content fl-photo-img-jpg">
				<a href="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1329_fullsize.jpg"  target="_self" itemprop="url">
				<img decoding="async" width="800" height="756" class="fl-photo-img wp-image-1675" src="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1329_fullsize.jpg" alt="Backus Hospital Piping" title="Backus_1329_fullsize" loading="lazy" itemprop="image" srcset="https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1329_fullsize.jpg 800w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1329_fullsize-300x284.jpg 300w, https://www.controlledair.com/wp-content/uploads/2014/04/Backus_1329_fullsize-768x726.jpg 768w" sizes="auto, (max-width: 800px) 100vw, 800px" />
				</a>
					</div>
	</div>
		</div>
			</div role=&quot;list&quot;>
	<div class="fl-clear"></div>
</div>
	</div>
</div>
</div>
</div>
	</div>
		</div>
	</div>
</div>
</div><p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital/">High Efficiency Boilers, Norwich CT | Backus Hospital</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.controlledair.com/client-showcase/backus-hospital/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Backus Hospital Annex Split</title>
		<link>https://www.controlledair.com/client-showcase/backus-hospital-annex-split/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=backus-hospital-annex-split</link>
		
		<dc:creator><![CDATA[Controlled Air Inc.]]></dc:creator>
		<pubDate>Thu, 01 Jan 1970 00:00:00 +0000</pubDate>
				<category><![CDATA[Client Showcase]]></category>
		<category><![CDATA[Hospitals]]></category>
		<category><![CDATA[HVAC]]></category>
		<guid isPermaLink="false">https://www.controlledair.com/backus-hospital-annex-split/</guid>

					<description><![CDATA[<p>Backus Hospital required a ductless split system in the annex building at the main hospital location. We installed a 3-top multi-zone split system with one outdoor unit with high heat output and low ambient with three wall mounted indoor units. We also installed programmable thermostats and electical. See Our Entire Client Showcase Our Specialties Service&#8230;</p>
<p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital-annex-split/">Backus Hospital Annex Split</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Backus Hospital required a ductless split system in the annex building at the main hospital location. We installed a 3-top multi-zone split system with one outdoor unit with high heat output and low ambient with three wall mounted indoor units. We also installed programmable thermostats and electical.</p>
<p><strong><a href="https://www.controlledair.com/client-showcase-2/">See Our Entire Client Showcase </a></strong></p>
<h2>Our Specialties</h2>
<p><a href="https://www.controlledair.com/service/">Service &amp; Maintenance Contracts</a></p>
<p>Cogeneration &amp; Microgrids</p>
<p>Surgical &amp; Medical Facilities</p>
<p>Industrial &amp; Manufacturing</p>
<h2>Recent Projects</h2>
<p><a href="https://www.controlledair.com/bridgeport-microgrid/">Bridgeport Microgrid</a></p>
<p><a href="https://www.controlledair.com/constitution-surgery-center/">Constitution Surgery Center</a></p>
<p><a href="https://www.controlledair.com/st-andrews-bridgeport/">St. Andrews Bridgeport</a></p>
<p><a href="https://www.controlledair.com/university-of-bridgeport/">University of Bridgeport</a></p>
<p>The post <a href="https://www.controlledair.com/client-showcase/backus-hospital-annex-split/">Backus Hospital Annex Split</a> appeared first on <a href="https://www.controlledair.com">Controlled Air, Inc.</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
