Hospitals
LiveWell
Controlled Air is part of a 50 million expansion at Dementia-focused LiveWell in the Plantsville section of Southington. LiveWell is a not-for-profit care provider that is solely focused on providing services for people with Alzheimer's disease and dementia. Its 8-acre campus features nursing, assisted living, and adult day facilities. The...
Sharon Hospital HVAC Upgrades
Sharon Hospital HVAC Upgrades Throughout the hospital Controlled Air, Inc. provided the following work: Fire Dampers, Air registers and diffusers, Hot water VAVs and associated piping, Ductwork, as well as Johnson controls BMS and wiring. The behavioral health unit in Sharon Hospital provides short-term psychiatric care of patients 55 and...
Rocky Hill Surgery Center
Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as...
Backus Hospital Plainfield
Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with...
Sharon Hospital
Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, "a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner...
Gaylord Hospital gas Conversion
Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion...
Backus Hospital
Backus Hospital's equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger...
Backus Hospital Annex Split
Backus Hospital required a ductless split system in the annex building at the main hospital location. We installed a 3-top multi-zone split system with one outdoor unit with high heat output and low ambient with three wall mounted indoor units. We also installed programmable thermostats and electical. See Our Entire...