Pharmaceutical Laboratory Controls

Pharmaceutical Laboratory Installation

Controlled Air, Inc. installed a Building Control System (BMS) for a pharmaceutical laboratory and office building allowing for proper operation and sequencing. The BMS was integrated with installed mechanical and process equipment. The BMS monitors the electric and BTU usage and work to make equipment operate at peak efficiency. The BMS is made by Johnson…

View More

Pharmaceutical Laboratory

We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building’s heating system indoors and electrical wiring to connect to…

View More