Projects

The Design-Build HVAC Advantage: Streamlining Complexity, Increasing Efficiency

In the traditional commercial construction model, a project is a hand-off: an engineer designs, a contractor bids, and a building owner manages the gap between the two. This "Plan-Spec" approach often leads to budget overruns, communication breakdowns, multiple change orders and systems that meet the minimum code but fail on...
Read More about The Design-Build HVAC Advantage: Streamlining Complexity, Increasing Efficiency

HVAC Installations, Bridgeport CT | Webster Bank Arena

At the Webster Bank Arena, Controlled Air, Inc. replaced two boilers which had a gross output of 4,334 MBH and an operating efficiency of 79% with two new high efficiency Sonic SC-4000 Patterson-Kelley boilers. The Sonic 4000 boiler has a gross output of 3,840 MBH and an AHRI thermal efficiency of 96.0%....
Read More about HVAC Installations, Bridgeport CT | Webster Bank Arena

News Categories