Delivering a Turnkey Energy Efficient HVAC Solution for Yanmar Warehouses

Delivering a Turnkey Energy Efficient HVAC Solution for Yanmar Warehouses Gas Heat Pumps

When a world-class equipment manufacturer needs to upgrade their own facilities, they need a partner who can manage the job from the structural engineering down to the final software programming. We are proud to announce the successful completion of a massive HVAC integration for the Yanmar Tractor and Parts Warehouses. For this project, Controlled Air served as the…

Read More

CHP Installation, Norwalk CT | The Maritime Aquarium Center

Tedom Cogeneration Rigging, Norwalk Connecticut, Maritime Center

The Maritime Aquarium at Norwalk recently worked with Controlled Air, inc, to improve their energy efficiency and reliability, we installed a Tedom CHP unit. Combined Heat and Power (CHP) systems offer significant benefits for aquariums, addressing their substantial and continuous energy demands for maintaining precise environmental conditions. Here are the key advantages: High Energy Efficiency:…

Read More

Microgrid, Middletown CT | Middletown Recreation Center

Middletown Recreation Center Embraces a Resilient and Sustainable Future with a New Microgrid In a significant step towards energy independence and sustainability, the Middletown Recreation Center has completed the installation of a new microgrid system. This project is a cornerstone of the city’s broader efforts to modernize its infrastructure and ensure the community’s safety and comfort, particularly during…

Read More

CHP Installation, Southington CT | YMCA

Yanmar Cogeneration for Pool and Recreational Facilities throughout Connecticut

SOUTHINGTON YMCA Controlled Air installed a Yanmar cogeneration system in coordination with a new boiler plant and domestic hot water production to reduce energy costs for the Southington YMCA. Our work included the mechanical demolition and removal of existing oil tanks, boilers, domestic hot water tanks, and remaining equipment from the previous co-generation system. At the heart of the new…

Read More

Boiler Replacement, Southbury CT | Pomperaug High School

Pomperaug high school installation

Pomperaug High School has been a long time customer of Controlled Air Inc. We have had many projects over the years. We currently have two large projects in process. One is the pool room complete renovations and the second is updating the heating for the gym. Details will be coming soon. The current gym heating…

Read More

VRF Installation, Simsbury CT | Ethel Walker School

Ethel Walker School Lennox VRF Installation

Ethel Walker School is located in Connecticut on a 175-acre campus sits amidst farms and meadows. For more than 100 years, The Ethel Walker School has been an all-girls school for grades 6-12 plus postgraduate education. This past summer Controlled Air, Inc. Worked with A.P. Construction to provide the HVAC portion of recent new building…

Read More

Closed Circuit Cooler Replacement

Evapco Cooler Replacement Holly Pond

Controlled Air, Inc. recently replaced an Evapco Cooler with an Evapco closed circuit cooler. The new Evapco cooler has low fan sound, an easy-to-maintain drive system, and a swing-out motor. We also installed a new VFD one-source power control panel with an integral variable frequency fan drive. Additionally, the steel supports were replaced so that…

Read More

VRF, Rooftop Units and Controls, Plantsville CT | LiveWell Care Facility

Livewell Installation

Controlled Air is part of a 50 million expansion at Dementia-focused LiveWell in the Plantsville section of Southington. LiveWell is a not-for-profit care provider that is solely focused on providing services for people with Alzheimer’s disease and dementia. Its 8-acre campus features nursing, assisted living, and adult day facilities. The new facility will add more…

Read More