VRF Installation, Shelton CT | Office Building

River Road VRF Installation Cassette

The River Road project is a new construction office complex. They wanted to provide comfort, efficiency and temperature management to all office locations. It was a custom design build project in which Controlled Air, Inc. performed all calculations and engineering required. We installed a VRF system  with variable speed  compressors for heating and cooling on…

Read More

HVAC and VRF, Rocky Hill CT | Surgery and Medical Center

Rocky Hill Surgery Center Rigging Day

Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and…

Read More

AAON Rooftop Units, Plainfield CT | Backus Hospital

Backus Hospital Plainfield

Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with specific humidification requirements. Additionally we…

Read More

AAON Rooftop Unit, Sharon CT | Sharon Hospital

Sharon Hospital Pharmacy Upgrades

Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, “a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation,…

Read More

Building Controls, New Haven CT | Pharmaceutical Laboratory

Pharmaceutical Laboratory Installation

Controlled Air, Inc. installed a Building Control System (BMS) for a pharmaceutical laboratory and office building allowing for proper operation and sequencing. The BMS was integrated with installed mechanical and process equipment. The BMS monitors the electric and BTU usage and work to make equipment operate at peak efficiency. The BMS is made by Johnson…

Read More

AAON Rooftop Units, Hamden CT | Endoscopy Center

The Endoscopy Center, Hamden CT

The Endoscopy Center was a large job with a very quick turn-around. A project of this size would typically take 3-4 weeks to complete but because of the requirements of the center we had to have the job complete within one week. The project included demolition of older ductwork; installation of  three Aaon units with…

Read More