Posts Tagged ‘Client Showcase’
University of Bridgeport, Bates Hall VRF System
We planned, designed, managed and installed one complete Lennox VRF system at Bates Hall, a historically recognized building on the campus of University of Bridgeport. This system was chosen due to the lack of space provided and the exceptional zoning capabilities it provides the customer. This system has the ability to heat and cool at the…
Read MoreCooling Tower & Building Controls, Cheshire CT | Office Building, Knotter Drive
The Knotter office building required a complete rebuild. The front entry needed to be redesigned because they had taken over the whole building and previously there had been multiple companies within the space. The heating and cooling was a challenge because the entryway was made mostly of glass, making so traditional heating and cooling could…
Read MoreBuilding Controls, Bethel CT | Bethel Library
In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls system, sensors register room occupancy so that…
Read MoreBoiler Replacement, Fairfield County CT | Augustana Homes
Augustana Homes required a hot water and domestic, heating boiler replacement. New pumps throughout. New boiler plant and new controls. A New chimney flue for a 10 story pipe. They received no incentives this time, but still chose a high efficiency boilers
Read MoreBoiler Replacement, Southbury CT | Rochambeau Elementary School
Region 15 Schools had old, inefficient oil fired burners for two existing boilers. We furnished and installed two Powerflame gas fired burners and made the necessary modifications to mount the burners. We were required to run new gas line from the meter, across the roof and down into the boiler room.
Read MoreHVAC Installation, Hartford CT | Office Building 55 Farmington Ave
55 Farmington Ave. began as a basic, but large project with a tenant fit out and rehabilitation for a state owned 12-story building. The building was being renovated for 10 state agencies to relocate. There were major time constraints on this project, which began in December, and needed to be completed by June 1. We…
Read MoreGas Conversation, Wallingford CT | Gaylord Hospital
Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion was completed quickly so that…
Read MoreHVAC Installation, New Haven CT | Long Wharf Theatre
The Long Wharf Theatre project almost didn’t happen. The original engineer’s design was at a cost of $1 mil. Controlled Air, Inc. redesigned the project and brought the cost down to $500,000. We also helped the customer receive $25,000 in incentives from CL&P for being more efficient then required by code. Controlled Air, Inc. provided them…
Read MoreRooftop Replacement, New Haven CT| Dwight Street Apartment
Customer had the existing RTU go down. Competing contractors were quoting units that required duct modifications, which drastically increased the price. We found a new Carrier unit in Stratford, that required no modifications and was a direct replacement for their old unit. Duct, gas and electrical connections all lined up perfectly. We got their cooling…
Read MoreNorthern Middlesex County YMCA Cogeneration Installation
Controlled Air, Inc. furnished and installed a Tecogen CM-75 Cogeneration system with a hospital grade silencer and power exhaust ventilator at the Middlesex YMCA. The projections were as follows: 2.05 year Return On Investment (ROI) Yearly Savings of 624,150 kWh Approximate Annual Energy savings of $146,147.35 Cogeneration would produce 3.76 Billion BTU’s of heat, and…
Read More