Building Controls, Bethel CT | Bethel Library

Bethel Library Building Controls

In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls system, sensors register room occupancy so that…

Read More

Gas Conversation, Wallingford CT | Gaylord Hospital

Gaylord Hospital Natural Gas Conversion

Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion was completed quickly so that…

Read More

HVAC Installation, New Haven CT | Long Wharf Theatre

Long Wharf Theatre RTU

The Long Wharf Theatre project almost didn’t happen. The original engineer’s design was at a cost of $1 mil. Controlled Air, Inc. redesigned the project and brought the cost down to $500,000. We also helped the customer receive $25,000 in incentives from CL&P for being more efficient then required by code. Controlled Air, Inc. provided them…

Read More

Rooftop Replacement, New Haven CT| Dwight Street Apartment

Controlled Air at 55 Dwight St RTU Installation

Customer had the existing RTU go down. Competing contractors were quoting units that required duct modifications, which drastically increased the price. We found a new Carrier unit in Stratford, that required no modifications and was a direct replacement for their old unit. Duct, gas and electrical connections all lined up perfectly. We got their cooling…

Read More

Northern Middlesex County YMCA Cogeneration Installation

YMCA Middlesex Front of Building

Controlled Air, Inc. furnished and installed a Tecogen CM-75 Cogeneration system with a hospital grade silencer and power exhaust ventilator at the Middlesex YMCA. The projections were as follows: 2.05 year Return On Investment (ROI) Yearly Savings of 624,150 kWh Approximate Annual Energy savings of $146,147.35 Cogeneration would produce 3.76 Billion BTU’s of heat, and…

Read More

HVAC System, Glastonbury CT | 80 Glastonbury Office Building

80 Glastonbury Controls System

The building is a 60,000 Sq ft brick three story office building constructed in 1988. The original HVAC system consisted of two original Trane natural gas heat, DX Cooling, 75 Ton RTU’s. The air was distributed via fan powered electric reheat VAV boxes. The original HVAC units were two 75 ton 8.26 EER Trane RTU’s. They had inlet vane…

Read More

Rooftop Unit Replacement, New Haven CT | Residential Care Home, Leeway House

Leeway House, RTU Installation

Leeway house had several defective rooftop units and had elevated energy costs. We installed 13 new high efficiency American Standard Rooftop heating and cooling units with economizers and dual enthalpy controllers. We also installed BACnet controls within the units and an energy management system allowing the entire system to be controlled from the facilities manager’s…

Read More