Posts Tagged ‘Client Showcase’
Rooftop Replacement, Norwalk CT | American Steakhouse
American Steakhouse in Norwalk had a RTU heater malfunction. They had a dining room full of customers that was getting colder by the minute. They called Controlled Air for help. Our technicians found the unit non-repairable. We located a stock unit and had the heat back in a timely manner so they did not lose any…
Read MoreHigh Efficiency Boilers, Norwich CT | Backus Hospital
Backus Hospital’s equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger and oil burner were also…
Read MoreRooftop Unit Replacement, West Haven CT | West Haven Medical Center
During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We installed three new high efficiency Carrier RTUs. The high efficiency units use 30% less power and qualify for $85 per ton plus…
Read MoreMicroturbine, New Haven CT | Pharmaceutical Laboratory
We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building’s heating system indoors and electrical wiring to connect to…
Read MoreCogeneration, Branford CT | Soundview YMCA
The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat 2 pools 24 hours per day, as well as hot water for showers, and running a dehumidifier. Controlled Air is installing a…
Read MoreRooftop Unit Replacement, Greenwich CT | Holly Hill Office Space
Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower was taller than the old tower, so before installation we had to present to Planning and Zoning proving that the new tower…
Read MoreHVAC Upgrades, Greenwich CT | Centre of Greenwich Office Building
The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the same size. The new unit…
Read MoreUnion Plaza Roof Top Replacement
Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The new unit was so large the we had to install cat walks for installation and service. We also upgraded the VAV boxes…
Read MoreCogeneration & Trigeneration, Fairfield CT | Fairfield Police Station
We installed a new TecoGen CM-50 50 kW gas fired Cogeneration unit. We also furnished and installed gas lines, make-up water lines, radiator piping, hot water piping, heat exchanger, circulators, and electrical conduit to make the cogeneration operational and running efficiently. We updated the controls system with wiring to integrate the cogeneration system into the…
Read MoreRoof Top Unit | Five Guys Burger
When we were called in to review Five Guys Burger’s RTU they were in bad condition. The equipment was dirty, old parts were just scattered around and there was a belt just lying on the roof. We put the belt back on just to get the equipment running temporarily until the new equipment came in. One…
Read More