Bethel Library

In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls system, sensors register room occupancy so that both the lighting turned off and the temperature adjusted to save energy.