MIDDLETOWN YMCA YANMAR

The Middletown YMCA was looking to expand their office space and purchased a historic home located near the facility. Controlled Air Inc. was challenged to find the most efficient solution to both install and run, heating and cooling for the new offices, allow for occupant comfort, while also bringing the home up-to-code. Controlled Air Inc.…

View More

St. Joseph’s High School

St. Joseph’s High School

St. Joseph’s High School was looking for an energy efficient way to manage their heating and cooling for their gym and chapel. They had main three criteria to solve their HVAC requirements. The school needed to provide cooling to the entire school. Any additional equipment added to their current HVAC could potentially overload their electrical…

View More

Bausch Advanced Technologies Cleanroom

BAUSCH Advanced Technology Group has over 60 years in engineering and manufacturing. Bausch has divisions located here in the USA, Germany, Brazil, and Switzerland. They offering table top units for small batches up to high speed fully automatic production lines for Syringes, Cartridges, Vials, Bottles, Ampoules, Bags and various other containers. Cleanrooms are used in…

View More

University of Bridgeport Bauer Hall

Bauer Hall was a major renovation of an old house which was converted to offices for the Universities use. The home had been vacant for many years and required a complete renovation. We worked alongside RAM Building Group. Controlled Air, Inc, furnished and installed a Lennox VRF system which included 2 outdoor units, 23 indoor…

View More

St. Thomas More, Darien

In this major renovation we worked alongside A. PappaJohn Company, a contractor located in Norwalk, Connecticut. St. Thomas More required a complete upgrade to the parish facilities. The focus of the renovation activities have been on the installation of the infrastructure to support the numerous systems inside the building which were inefficient and obsolete. The…

View More

West Haven Veterans Museum

The West Haven Veterans Museum located on Terrace Street in West Haven was built to honor then men and women who have served our Country in time of conflict and natural disaster. The museum’s goal is to focus on patriots from Connecticut and to show they survived. They are a non-profit organization that tries to…

View More

River Road, Shelton

The River Road project is a new construction office complex. They wanted to provide comfort, efficiency and temperature management to all office locations. It was a custom design build project in which Controlled Air, Inc. performed all calculations and engineering required. We installed a VRF system  with variable speed  compressors for heating and cooling on…

View More

Rocky Hill Surgery Center

Rocky Hill Surgery Center Rigging Day

Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and…

View More

Hartford Hospital Histology

Hartford Hospital Histology

For this project we needed to set up a new lab in an existing hospital space. There was a lot of intricacy, coordination and planning to work inside a functioning hospital that allowed for no downtime. The exhaust fan was 3 floors down and autopsy and tissue sampling was using the same system. Additionally the…

View More

Backus Hospital Plainfield

Backus Hospital Plainfield

Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with specific humidification requirements. Additionally we…

View More

1010 Washington Blvd, Stamford Roof Top Unit Replacement

1010 Washington Blvd, Stamford RTU Replacement

We replaced a 105-ton RTU, reconnected controls and balanced the unit. Because of the size of the unit and the height of the building, the replacement was performed over the weekend and we had to close down a city block. See Our Entire Client Showcase Our Specialties Service & Maintenance Contracts Cogeneration & Microgrids Surgical…

View More

Christian Community Action New Haven

Christian Community Action Boiler Replacement

Christian Community Action, a non-profit located in New Haven, CT provides shelter for the homeless. They recently called for loss of heat. Upon inspection we determined that there were issues with their current boilers.  One boiler was dead the other one was acting up. After discussing options, including high efficiency versus standard efficiency, they decided…

View More