Client Showcase
Middletown Recreation Center
The Middletown Recreation Center had is soft grand opening on Monday, January 9th. In this recent update, Controlled Air worked with Clarke Energy to create a energy efficient solution integrating multiple products including YANMAR CHP. More information will be provided soon.
View MoreThe Elm City Bioscience Center
Controlled Air Inc. provided mechanical design build support to the Elm City Bioscience building infrastructure upgrades located in New Haven. The bioscience building is 113,620 sq ft which includes 8 stories plus a lower level and mechanical penthouse. The project will be on-going with multiple floors being converted from smaller office spaces to larger open…
View MoreNaugatuck High School
A recent article in Combined Heat and Power Magazine highlighted an energy project at Naugatuck High School. Controlled Air Inc. worked with Advanced Energy Efficiencies to develop a cogeneration installation that will provide 140 kW of electrical power and 820,000 Btus of hot water supply. Advanced Energy Efficiencies put together a highlight video giving a…
View MoreFascia’s Chocolate
Fascia’s Chocolates is a family owned chocolate company located in Waterbury CT. They have been in existence since 1964 and have been winners of multiple awards. As they have grown and their energy demands have increased they decided to make improvements to their existing facility. Advanced Energy Efficiencies and Controlled Air Inc. worked together to…
View MoreMIDDLETOWN YMCA YANMAR
The Middletown YMCA was looking to expand their office space and purchased a historic home located near the facility. Controlled Air Inc. was challenged to find the most efficient solution to both install and run, heating and cooling for the new offices, allow for occupant comfort, while also bringing the home up-to-code. Controlled Air Inc.…
View MoreSt. Joseph’s High School
St. Joseph’s High School was looking for an energy efficient way to manage their heating and cooling for their gym and chapel. They had main three criteria to solve their HVAC requirements. The school needed to provide cooling to the entire school. Any additional equipment added to their current HVAC could potentially overload their electrical…
View MoreBausch Advanced Technologies Cleanroom
BAUSCH Advanced Technology Group has over 60 years in engineering and manufacturing. Bausch has divisions located here in the USA, Germany, Brazil, and Switzerland. They offering table top units for small batches up to high speed fully automatic production lines for Syringes, Cartridges, Vials, Bottles, Ampoules, Bags and various other containers. Cleanrooms are used in…
View MoreUniversity of Bridgeport Bauer Hall
Bauer Hall was a major renovation of an old house which was converted to offices for the Universities use. The home had been vacant for many years and required a complete renovation. We worked alongside RAM Building Group. Controlled Air, Inc, furnished and installed a Lennox VRF system which included 2 outdoor units, 23 indoor…
View MoreSt. Thomas More, Darien
In this major renovation we worked alongside A. PappaJohn Company, a contractor located in Norwalk, Connecticut. St. Thomas More required a complete upgrade to the parish facilities. The focus of the renovation activities have been on the installation of the infrastructure to support the numerous systems inside the building which were inefficient and obsolete. The…
View MoreWest Haven Veterans Museum
The West Haven Veterans Museum located on Terrace Street in West Haven was built to honor then men and women who have served our Country in time of conflict and natural disaster. The museum’s goal is to focus on patriots from Connecticut and to show they survived. They are a non-profit organization that tries to…
View MoreRiver Road, Shelton
The River Road project is a new construction office complex. They wanted to provide comfort, efficiency and temperature management to all office locations. It was a custom design build project in which Controlled Air, Inc. performed all calculations and engineering required. We installed a VRF system with variable speed compressors for heating and cooling on…
View MoreRocky Hill Surgery Center
Controlled Air, Inc. was excited to work with AZ Corporation on the newest orthopedic surgery center in Rocky Hill, Connecticut with 7 operating rooms and 1 procedure room. This was a new build project that required strict standards to adhere to the ASHRAE requirements for any medical center, such as increased air change outs and…
View More