Kerite

Kerite, Seymour installation of new RTU installation

Controlled Air, Inc. removed six old 25-ton rooftop units. Six new, high efficiency Carrier 25-ton units which were installed, as well as smoke detectors, control wiring, and condensate drain piping. The new units fit in the locations of the old units perfectly, so no adapter curbs were required. Overall a simple roof top unit replacement.…

View More

New England Air Museum

New England Air Museum Air Conditioning

New England Air Museum has been a customer of Controlled Air, Inc. for a few years now. In this latest project, we added air conditioning to two buildings where airplanes are displayed. What was special about this project is they did not want the units blocking the displays or impacting the viewer. Units that would…

View More

PCC Structurals, Groton

PCC Structurals

PCC Structurals Wax Room Chiller – An aging process chiller put the production capabilities of PCC Structurals at risk so they turned to Controlled Air, Inc. to design and build a new process cooling system. Controlled Air, Inc. recommended installing a new chiller on the roof so a steel support system was designed and installed.…

View More

Stony Creek Brewery

Stony Creek Brewery, Branford CT

Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4 ignition gas fired heaters, dampers, one split system, electric baseboard heating, duct work distribution system, piping, controls and controls wiring. What was…

View More

Bridgeport Microgrid

Bridgeport Microgrid

The Bridgeport Microgrid was acquired by Scale Microgrid Solutions in 2021. Bridgeport Microgrid is a partnership between OR&L Construction in Branford, Controlled Air and Power Island Energy in Jacksonville, Fla. Controlled Air, Inc. will be in charge of the design build concept. This includes the design and installation of the Congeneration System, chilled water system,…

View More

Knotter Drive

350 Knotter Drive Controlled Air Installation

The Knotter office building required a complete rebuild. The front entry needed to be redesigned because they had taken over the whole building and previously there had been multiple companies within the space. The heating and cooling was a challenge because the entryway was made mostly of glass, making so traditional heating and cooling could…

View More

Bethel Library

Bethel Library Building Controls

In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls system, sensors register room occupancy so that…

View More

Augustana Homes

Augustana Homes Boiler Replacement

Augustana Homes required a hot water and domestic, heating boiler replacement. New pumps throughout. New boiler plant and new controls. A New chimney flue  for a 10 story pipe. They received no incentives this time, but still chose a high efficiency boilers See Our Entire Client Showcase Our Specialties Service & Maintenance Contracts Cogeneration &…

View More

Rochambeau Elementary School

Rochambeau Elementary School Natural Gas Conversion

Region 15 Schools had old, inefficient oil fired burners for two existing boilers. We furnished and installed two Powerflame gas fired burners and made the necessary modifications to mount the burners. We were required to run new gas line from the meter, across the roof and down into the boiler room. See Our Entire Client…

View More

55 Farmington Ave., Hartford

55 Farmington Ave. began as a basic, but large project with a tenant fit out and rehabilitation for a state owned 12-story building. The building was being renovated for 10 state agencies to relocate. There were major time constraints on this project, which began in December, and needed to be completed by June 1. We…

View More

Gaylord Hospital gas Conversion

Gaylord Hospital Natural Gas Conversion

Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered with Yankee gas to provide a seemless transition with no downtime. It was important that the conversion was completed quickly so that…

View More

Long Wharf Theatre

Long Wharf Theatre RTU

The Long Wharf Theatre project almost didn’t happen. The original engineer’s design was at a cost of $1 mil. Controlled Air, Inc. redesigned the project and brought the cost down to $500,000. We also helped the customer receive $25,000 in incentives from CL&P for being more efficient then required by code. Controlled Air, Inc. provided them…

View More