Posts Tagged ‘Client Showcase’
Christian Community Action New Haven
Christian Community Action, a non-profit located in New Haven, CT provides shelter for the homeless. They recently called for loss of heat. Upon inspection we determined that there were issues with their current boilers. One boiler was dead the other one was acting up. After discussing options, including high efficiency versus standard efficiency, they decided…
Read MoreSharon Hospital
Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, “a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation,…
Read MorePharmaceutical Laboratory Controls
Controlled Air, Inc. installed a Building Control System (BMS) for a pharmaceutical laboratory and office building allowing for proper operation and sequencing. The BMS was integrated with installed mechanical and process equipment. The BMS monitors the electric and BTU usage and work to make equipment operate at peak efficiency. The BMS is made by Johnson…
Read MoreCastle Rock Condominiums
The Castle Rock Condominium project will be done in two phases. There are a total of 45 roof tops units that require replacement. We recently replaced 23 and will complete the change out process later in November. The project includes disconnection, removal of 45 old out dated RTU’s and installation of new units with 2-stages…
Read MoreEndoscopy Center
The Endoscopy Center was a large job with a very quick turn-around. A project of this size would typically take 3-4 weeks to complete but because of the requirements of the center we had to have the job complete within one week. The project included demolition of older ductwork; installation of three Aaon units with…
Read MoreCell Tower Upgrades for Verizon
We are providing air conditioning replacements and upgrades to remote based cell sites all over Connecticut. Many of these replacements are custom design build to fit specific locations such as basements, roofs or in the middle of an office building. We are removing old R-22 unit and replacing them with 410A more environmentally friendly units.…
Read MoreKerite
Controlled Air, Inc. removed six old 25-ton rooftop units. Six new, high efficiency Carrier 25-ton units which were installed, as well as smoke detectors, control wiring, and condensate drain piping. The new units fit in the locations of the old units perfectly, so no adapter curbs were required. Overall a simple roof top unit replacement.…
Read MoreNew England Air Museum
New England Air Museum has been a customer of Controlled Air, Inc. for a few years now. In this latest project, we added air conditioning to two buildings where airplanes are displayed. What was special about this project is they did not want the units blocking the displays or impacting the viewer. Units that would…
Read MorePCC Structurals, Groton
PCC Structurals Wax Room Chiller – An aging process chiller put the production capabilities of PCC Structurals at risk so they turned to Controlled Air, Inc. to design and build a new process cooling system. Controlled Air, Inc. recommended installing a new chiller on the roof so a steel support system was designed and installed.…
Read MoreStony Creek Brewery
Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4 ignition gas fired heaters, dampers, one split system, electric baseboard heating, duct work distribution system, piping, controls and controls wiring. What was…
Read More