Dwight Street RTU Replacement

Controlled Air at 55 Dwight St RTU Installation

Customer had the existing RTU go down. Competing contractors were quoting units that required duct modifications, which drastically increased the price. We found a new Carrier unit in Stratford, that required no modifications and was a direct replacement for their old unit. Duct, gas and electrical connections all lined up perfectly. We got their cooling working again in…

View More

Northern Middlesex County YMCA Cogeneration Installation

YMCA Middlesex Cogeneration System

Controlled Air, Inc. furnished and installed a Tecogen CM-75 Cogeneration system with a hospital grade silencer and power exhaust ventilator at the Middlesex YMCA. The projections were as follows: 2.05 year Return On Investment (ROI) Yearly Savings of 624,150 kWh Approximate Annual Energy savings of $146,147.35 Cogeneration would produce 3.76 Billion BTU’s of heat, and…

View More

80 Glastonbury HVAC System

80 Glastonbury Controls System

The building is a 60,000 Sq ft brick three story office building constructed in 1988. The original HVAC system consisted of two original Trane natural gas heat, DX Cooling, 75 Ton RTU’s. The air was distributed via fan powered electric reheat VAV boxes. The original HVAC units were two 75 ton 8.26 EER Trane RTU’s. They had inlet vane…

View More

Leeway House

Leeway House, RTU Installation

Leeway house had several defective rooftop units and had elevated energy costs. We installed 13 new high efficiency American Standard Rooftop heating and cooling units with economizers and dual enthalpy controllers. We also installed BACnet controls within the units and an energy management system allowing the entire system to be controlled from the facilities manager’s…

View More

American Steakhouse

American Steakhouse in Norwalk had a RTU heater malfunction. They had a dining room full of customers that was getting colder by the minute. They called Controlled Air for help. Our technicians found the unit non-repairable. We located a stock unit and had the heat back in a timely manner so they did not lose any…

View More

Backus Hospital

Backus Hospital Generator

Backus Hospital’s equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger and oil burner were also…

View More

West Haven Medical Center

During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We installed three new high efficiency Carrier RTUs. The high efficiency units use 30% less power and qualify for $85 per ton plus…

View More

Pharmaceutical Laboratory

We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building’s heating system indoors and electrical wiring to connect to…

View More

Soundview YMCA

Soundview YMCA New Construction

The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat 2 pools 24 hours per day, as well as hot water for showers, and running a dehumidifier. Controlled Air is installing a…

View More

Holly Hill Office Space

Holly Hill Office Building RTU Replacement

Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower was taller than the old tower, so before installation we had to present to Planning and Zoning proving that the new tower…

View More

Centre of Greenwich

Centre of Greenwich Piping

The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the same size. The new unit…

View More

Union Plaza Roof Top Replacement

Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The new unit was so large the we had to install cat walks for installation and service. We also upgraded the VAV boxes…

View More