HVAC
Backus Hospital
    Backus Hospital's equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger...
				
				
				
				
			West Haven Medical Center
    During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We installed three new high efficiency Carrier RTUs. The high efficiency units use 30% less power and qualify...
				
				
				
				
			Pharmaceutical Laboratory
    We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building's heating system indoors and...
				
				
				
				
			Soundview YMCA
    The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat 2 pools 24 hours per day, as well as hot water for showers, and running a dehumidifier....
				
				
				
				
			Holly Hill Office Space
    Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower was taller than the old tower, so before installation we had to present to Planning and Zoning...
				
				
				
				
			Centre of Greenwich
    The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the...
				
				
				
				
			Union Plaza Roof Top Replacement
    Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The new unit was so large the we had to install cat walks for installation and service. We...
				
				
				
				
			Five Guys Burger Roof Top Unit
    When we were called in to review Five Guys Burger's RTU they were in bad condition. The equipment was dirty, old parts were just scattered around and there was a belt just lying on the roof. We put the belt back on just to get the equipment running temporarily until the...
				
				
				
				
			IAE Office Space
    This amazing remodel included variable speed air handlers and sensors that read the room occupancy. The room sensors control the temperature and air speed, so that when the room is empty no energy is wasted. With shallow ceiling to deck space customized soffits and duct work was required to make...
				
				
				
				
			Carters Roof Top Unit
    Carters had a malfunctioning 15-ton heating & cooling rooftop unit. The existing unit had a defective heat exchanger, defective compressor and a refrigerant leak within the condenser. We reclaimed the R-22 per EPA guidelines and removed the old equipment. We then furnished a new high efficiency American Standard RTU with...
				
				
				
				
			 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				 
				