Porta-Fab Enclosures
Controlled Air, Inc. is now an authorized dealer for PortaFab enclosures. PortaFab products allow us to design and build critical environments such as cleanrooms, data rooms, security enclosures, environmental rooms, temperature and humidity…
Read More55 Farmington Ave., Hartford
55 Farmington Ave. began as a basic, but large project with a tenant fit out and rehabilitation for a state owned 12-story building. The building was being renovated for 10 state agencies to…
Read MoreControlled Air Inc. truly is a family owned business.
Controlled Air, Inc. has been a family own business since 1980. Now, almost 35 years later the legacy continues. The business started with Vincent Chiocchio Sr. and Vincent Chiocchio Jr. and over the…
Read MoreQuick Winter Tips
Taking care of these basic items can help save you money and energy. Clear off roof hatches of snow and ice. If hatches are not cleared and there is an emergency we will…
Read MoreGaylord Hospital gas Conversion
Gaylord Hospital in Wallingford was converted from oil or propane to natural gas. We converted 16 burners, piping, meters, chimney liners and 3 boiler plants. The conversion also included all kitchen equipment. We partnered…
Read MoreFacilities Engineering Journal
Check out page three where our President, VIn Chiochio was quoted
Read MoreLong Wharf Theatre
The Long Wharf Theatre project almost didn’t happen. The original engineer’s design was at a cost of $1 mil. Controlled Air, Inc. redesigned the project and brought the cost down to $500,000. We…
Read MoreDwight Street RTU Replacement
Customer had the existing RTU go down. Competing contractors were quoting units that required duct modifications, which drastically increased the price. We found a new Carrier unit in Stratford, that required no modifications and…
Read MoreBest Service In Class
Controlled Air, Inc. takes great pride in our service department. If you have every wondered what happens when you place a service call, watch our movie and find out!
Read MoreNorthern Middlesex County YMCA Cogeneration Installation
Controlled Air, Inc. furnished and installed a Tecogen CM-75 Cogeneration system with a hospital grade silencer and power exhaust ventilator at the Middlesex YMCA. The projections were as follows: 2.05 year Return On…
Read MoreEfficient Building Controls
Building controls systems are one way to save money and energy on your building. If your system is not set up correctly you could lose energy and money. There are many reasons you…
Read More80 Glastonbury HVAC System
The building is a 60,000 Sq ft brick three story office building constructed in 1988. The original HVAC system consisted of two original Trane natural gas heat, DX Cooling, 75 Ton RTU’s. The air…
Read More