Northern Middlesex County YMCA Cogeneration Installation

Controlled Air, Inc. furnished and installed a Tecogen CM-75 Cogeneration system with a hospital grade silencer and power exhaust ventilator at the Middlesex YMCA. The projections were as follows: 2.05 year Return On Investment (ROI) Yearly Savings of 624,150 kWh Approximate Annual Energy savings of $146,147.35 Cogeneration would produce 3.76...
Read More about Northern Middlesex County YMCA Cogeneration Installation

HVAC System, Glastonbury CT | 80 Glastonbury Office Building

The building is a 60,000 Sq ft brick three story office building constructed in 1988. The original HVAC system consisted of two original Trane natural gas heat, DX Cooling, 75 Ton RTU's. The air was distributed via fan powered electric reheat VAV boxes. The original HVAC units were two 75 ton 8.26 EER Trane...
Read More about HVAC System, Glastonbury CT | 80 Glastonbury Office Building

Rooftop Unit Replacement, New Haven CT | Residential Care Home, Leeway House

Leeway house had several defective rooftop units and had elevated energy costs. We installed 13 new high efficiency American Standard Rooftop heating and cooling units with economizers and dual enthalpy controllers. We also installed BACnet controls within the units and an energy management system allowing the entire system to be...
Read More about Rooftop Unit Replacement, New Haven CT | Residential Care Home, Leeway House

Rooftop Replacement, Norwalk CT | American Steakhouse

American Steakhouse in Norwalk had a RTU heater malfunction. They had a dining room full of customers that was getting colder by the minute. They called Controlled Air for help. Our technicians found the unit non-repairable. We located a stock unit and had the heat back in a timely manner so...
Read More about Rooftop Replacement, Norwalk CT | American Steakhouse

High Efficiency Boilers, Norwich CT | Backus Hospital

Backus Hospital's equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger...
Read More about High Efficiency Boilers, Norwich CT | Backus Hospital

Rooftop Unit Replacement, West Haven CT | West Haven Medical Center

During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We installed three new high efficiency Carrier RTUs. The high efficiency units use 30% less power and qualify...
Read More about Rooftop Unit Replacement, West Haven CT | West Haven Medical Center

Microturbine, New Haven CT | Pharmaceutical Laboratory

We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building's heating system indoors and...
Read More about Microturbine, New Haven CT | Pharmaceutical Laboratory

Cogeneration, Branford CT | Soundview YMCA

The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat 2 pools 24 hours per day, as well as hot water for showers, and running a dehumidifier....
Read More about Cogeneration, Branford CT | Soundview YMCA

Rooftop Unit Replacement, Greenwich CT | Holly Hill Office Space

Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower was taller than the old tower, so before installation we had to present to Planning and Zoning...
Read More about Rooftop Unit Replacement, Greenwich CT | Holly Hill Office Space

HVAC Upgrades, Greenwich CT | Centre of Greenwich Office Building

The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the...
Read More about HVAC Upgrades, Greenwich CT | Centre of Greenwich Office Building