Client Showcase

Backus Hospital Plainfield

Backus Hospital in Plainfield is a two story medical facility that was completed in three parts.The first floor had exam rooms, pharmacy and a cytotoxic laboratory, which required HEPA filtration, strict pressure monitoring, alarming, custom displays and hood certification for bio hoods. The second floor has three operating rooms with...
Read More about Backus Hospital Plainfield

1010 Washington Blvd, Stamford Roof Top Unit Replacement

We replaced a 105-ton RTU, reconnected controls and balanced the unit. Because of the size of the unit and the height of the building, the replacement was performed over the weekend and we had to close down a city block.
Read More about 1010 Washington Blvd, Stamford Roof Top Unit Replacement

Christian Community Action New Haven

Christian Community Action, a non-profit located in New Haven, CT provides shelter for the homeless. They recently called for loss of heat. Upon inspection we determined that there were issues with their current boilers.  One boiler was dead the other one was acting up. After discussing options, including high efficiency...
Read More about Christian Community Action New Haven

Sharon Hospital

Sharon Hospital Pharmacy upgrades required compliance with state and federal regulations for air flow, pressure and humidity. As any pharmacy must be a cleanroom as defined in ISO standard 14644, "a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner...
Read More about Sharon Hospital

Pharmaceutical Laboratory Controls

Controlled Air, Inc. installed a Building Control System (BMS) for a pharmaceutical laboratory and office building allowing for proper operation and sequencing. The BMS was integrated with installed mechanical and process equipment. The BMS monitors the electric and BTU usage and work to make equipment operate at peak efficiency. The...
Read More about Pharmaceutical Laboratory Controls

Castle Rock Condominiums

The Castle Rock Condominium project will be done in two phases. There are a total of 45 roof tops units that require replacement. We recently replaced 23 and will complete the change out process later in November. The project includes disconnection, removal of 45 old out dated RTU's and installation...
Read More about Castle Rock Condominiums

Endoscopy Center

The Endoscopy Center was a large job with a very quick turn-around. A project of this size would typically take 3-4 weeks to complete but because of the requirements of the center we had to have the job complete within one week. The project included demolition of older ductwork; installation...
Read More about Endoscopy Center

Cell Tower Upgrades for Verizon

We are providing air conditioning replacements and upgrades to remote based cell sites all over Connecticut. Many of these replacements are custom design build to fit specific locations such as basements, roofs or in the middle of an office building. We are removing old R-22 unit and replacing them with...
Read More about Cell Tower Upgrades for Verizon

Preparing For Storm Season

Hurricane Straps/Clips Hurricane straps are designed to secure a rooftop unit to a roof curb. By doing this, the rooftop unit is more likely to withstand high wind gusts, thereby reducing the chance of the unit separating from the roof curb and causing damage to other equipment, people or the...
Read More about Preparing For Storm Season

Kerite

Controlled Air, Inc. removed six old 25-ton rooftop units. Six new, high efficiency Carrier 25-ton units which were installed, as well as smoke detectors, control wiring, and condensate drain piping. The new units fit in the locations of the old units perfectly, so no adapter curbs were required. Overall a...
Read More about Kerite