Client Showcase
New England Air Museum
New England Air Museum has been a customer of Controlled Air, Inc. for a few years now. In this latest project, we added air conditioning to two buildings where airplanes are displayed. What was special about this project is they did not want the units blocking the displays or impacting...
PCC Structurals, Groton
PCC Structurals Wax Room Chiller - An aging process chiller put the production capabilities of PCC Structurals at risk so they turned to Controlled Air, Inc. to design and build a new process cooling system. Controlled Air, Inc. recommended installing a new chiller on the roof so a steel support...
Stony Creek Brewery
Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4 ignition gas fired heaters, dampers, one split system, electric baseboard heating, duct work distribution system, piping, controls...
Bridgeport Microgrid
The Bridgeport Microgrid was acquired by Scale Microgrid Solutions in 2021. Bridgeport Microgrid is a partnership between OR&L Construction in Branford, Controlled Air and Power Island Energy in Jacksonville, Fla. Controlled Air, Inc. will be in charge of the design build concept. This includes the design and installation of the...
University of Bridgeport, Bates Hall VRF System
We planned, designed, managed and installed one complete Lennox VRF system at Bates Hall, a historically recognized building on the campus of University of Bridgeport. This system was chosen due to the lack of space provided and the exceptional zoning capabilities it provides the customer. This system has the ability to...
Knotter Drive
The Knotter office building required a complete rebuild. The front entry needed to be redesigned because they had taken over the whole building and previously there had been multiple companies within the space. The heating and cooling was a challenge because the entryway was made mostly of glass, making so...
Bethel Library
In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either continuously on or continuously off. Their system was wasting both money and energy. In the new controls...
Augustana Homes
Augustana Homes required a hot water and domestic, heating boiler replacement. New pumps throughout. New boiler plant and new controls. A New chimney flue for a 10 story pipe. They received no incentives this time, but still chose a high efficiency boilers
Rochambeau Elementary School
Region 15 Schools had old, inefficient oil fired burners for two existing boilers. We furnished and installed two Powerflame gas fired burners and made the necessary modifications to mount the burners. We were required to run new gas line from the meter, across the roof and down into the boiler...
55 Farmington Ave., Hartford
55 Farmington Ave. began as a basic, but large project with a tenant fit out and rehabilitation for a state owned 12-story building. The building was being renovated for 10 state agencies to relocate. There were major time constraints on this project, which began in December, and needed to be...