High Efficiency Boilers, Norwich CT | Backus Hospital

Backus Hospital's equipment was insufficient for their needs. Their 5000 gal oil tank was used for both heating and running the generator. There was an issue with sulphur in the oil that was not compatible with the generator. For the generator to run optimally it required diesel. The heat exchanger...
Read More about High Efficiency Boilers, Norwich CT | Backus Hospital

Rooftop Unit Replacement, West Haven CT | West Haven Medical Center

During a routine maintenance we discovered defective heat exchangers and inoperative outside air economizers on their roof top units. The defective units included two 5-ton Carrier and one 8.5 ton carrier unit. We installed three new high efficiency Carrier RTUs. The high efficiency units use 30% less power and qualify...
Read More about Rooftop Unit Replacement, West Haven CT | West Haven Medical Center

Microturbine, New Haven CT | Pharmaceutical Laboratory

We designed and installed a Cogeneration system with four 65 kW Capstone Micro Turbines to provide both heating and electrical to offset the buildings energy requirements. This Combined Heat and Power system has a heat recovery piping system that connects the micro turbines to the building's heating system indoors and...
Read More about Microturbine, New Haven CT | Pharmaceutical Laboratory

Cogeneration, Branford CT | Soundview YMCA

The New Soundview YMCA will be a great addition to the Branford community offering 2 pools, cardio, weights, teen center, and aerobics. They will have a high energy demand in order to heat 2 pools 24 hours per day, as well as hot water for showers, and running a dehumidifier....
Read More about Cogeneration, Branford CT | Soundview YMCA

Rooftop Unit Replacement, Greenwich CT | Holly Hill Office Space

Holly Hill Office Building had an Old Baltimore ejector tower. The tower had no fans and only a high-pressure pump leading it to be inefficient and expensive to run. The new cooling tower was taller than the old tower, so before installation we had to present to Planning and Zoning...
Read More about Rooftop Unit Replacement, Greenwich CT | Holly Hill Office Space

HVAC Upgrades, Greenwich CT | Centre of Greenwich Office Building

The Centre at Greenwich needed to replace old outdated and low capacity equipment. The problem was that while needing a higher capacity unit, size was an issue. The town of Greenwich requires that nothing can be viewable from the street. We found a Evapco 600 ton-cooling tower that was the...
Read More about HVAC Upgrades, Greenwich CT | Centre of Greenwich Office Building

Union Plaza Roof Top Replacement

Union Plaza had mismatched, inefficient, and past expectancy roof top units. We installed new high efficiency units and received incentives and rebates that helped pay for a good portion of the project. The new unit was so large the we had to install cat walks for installation and service. We...
Read More about Union Plaza Roof Top Replacement

Cogeneration & Trigeneration, Fairfield CT | Fairfield Police Station

We installed a new TecoGen CM-50 50 kW gas fired Cogeneration unit. We also furnished and installed gas lines, make-up water lines, radiator piping, hot water piping, heat exchanger, circulators, and electrical conduit to make the cogeneration operational and running efficiently. We updated the controls system with wiring to integrate...
Read More about Cogeneration & Trigeneration, Fairfield CT | Fairfield Police Station

Roof Top Unit | Five Guys Burger

When we were called in to review Five Guys Burger's RTU they were in bad condition. The equipment was dirty, old parts were just scattered around and there was a belt just lying on the roof. We put the belt back on just to get the equipment running temporarily until the...
Read More about Roof Top Unit | Five Guys Burger

IAE Office Space

This amazing remodel included variable speed air handlers and sensors that read the room occupancy. The room sensors control the temperature and air speed, so that when the room is empty no energy is wasted. With shallow ceiling to deck space customized soffits and duct work was required to make...
Read More about IAE Office Space