Stony Creek Brewery, Branford CT

Stony Creek Brewery

June 13, 2017

Stony Creek Brewery was new construction. We worked in combination with Pat Munger Construction and Joseph T Sepot Architects. Controlled Air, Inc. installed 3 gas/electric roof top units with curbs and economizers, 4…

Read More
Bridgeport Microgrid

Bridgeport Microgrid

December 10, 2016

Bridgeport Microgrid is a partnership between OR&L Construction in Branford, Controlled Air and Power Island Energy in Jacksonville, Fla. Controlled Air, Inc. will be in charge of the design build concept. This includes…

Read More

Update on R-22 Replacements

December 5, 2016

R-22 Replacements R22 Replacement – As we had previously reported, the price of R22 continues to rise. Since the start of the summer season, we’ve seen the wholesale price of R22 jump over…

Read More

Heat Exchangers

November 5, 2016

Cooler weather is quickly approaching. With the hot summer we had, the last thing we might think about is the heating components of our HVAC system. In a rooftop unit or furnace, the…

Read More
Webster Arena HVAC Upgrades

Webster Bank Arena

June 29, 2016

At the Webster Bank Arena, Controlled Air, Inc. replaced two boilers which had a gross output of 4,334 MBH and an operating efficiency of 79% with two new high efficiency Sonic SC-4000 Patterson-Kelley boilers. The…

Read More

Greenhouse Gas Emissions Savings

June 16, 2016

Controlled Air, Inc, is an active member of CHP EPA Partnership. Each year we submit information about the CHP/Cogeneration project that we complete. In 2015 our six CHP projects have avoided emissions of an…

Read More

The Final Phaseout of R-22

June 8, 2016

The final phase-out of R-22 will once again be impacting supplies and prices of R-22. The U.S. Environmental Protection Agency (EPA) final phasedown schedule is as follows: Drop from 51 million pounds allowed…

Read More
Legionella

Legionella

January 22, 2016

Legionella is an air-borne bacteria that can affect those working in close proximity with Cooling Towers, Evaporative Condensers, and Fluid Coolers, as well as those inside closed office buildings. Cooling towers, evaporative condensers…

Read More

University of Bridgeport, Bates Hall VRF System

January 5, 2016

We planned, designed, managed and installed one complete Lennox VRF system at Bates Hall, a historically recognized building on the campus of University of Bridgeport. This system was chosen due to the lack of…

Read More
Ice Dams

Ice Dams

December 29, 2015

What is an Ice Dam? An ice dam is a hump of ice that forms at the edge of the roof. Ice dams form when a home’s escaping heat warms the roof and melts the…

Read More

Knotter Drive

December 5, 2015

The Knotter office building required a complete rebuild. The front entry needed to be redesigned because they had taken over the whole building and previously there had been multiple companies within the space.…

Read More
Bethel Library Building Controls

Bethel Library

September 25, 2015

In the Bethel Library we completed a second floor tenet fit out. We installed an entire building controls system which included lighting, and air handlers. Their existing heating and lighting system was either…